Quality and compliance
The paperwork is part of the product
We build the record while we build the vessel, so inspectors and regulators get what they ask for.
Standards we work to
Inspection stages
How each vessel is checked
- 1
Material check
Plate and certificates are verified on receipt.
- 2
Fit-up
Parts are checked against the drawing before welding.
- 3
Welding
Qualified procedures, with visual inspection of seams.
- 4
Examination
Non-destructive examination where the code or client requires it.
- 5
Pressure test
Pneumatic or hydrostatic test with a signed certificate.
- 6
Handover
Dossier, certificates and drawings delivered with the unit.
Documents
Documents that travel with every unit
OGRA sheet detail
Detail sheet for each unit
Material test certificates
Plate certificates in EN 10204 3.1 form
Test certificate
Pneumatic or hydrostatic test, signed
Delivery dossier
Drawings and inspection records



Images marked Illustrative are representative artwork, not photographs of a specific AHSE project.
Send us the job. We reply with a scope.
Product, size and site are enough to start.